Delay causes in the construction of the refinery projects in Vietnam : a case study on the Dung Quat Refinery Project

AuthorNguyen Thi Thu Huong
Call NumberAIT Proj. no.CM-09-39
Subject(s)Construction contracts--Vietnam
Petroleum refineries--Vietnam

NoteA report submitted in partial fulfillment of the requirements for the degree of Professional Master of Engineering in Construction Engineering and Infrastructure Management
PublisherAsian Institute of Technology
Series StatementProject ; no. CM-09-39
AbstractIn general, project completed with destined time, cost, and quality is the basic target of construction project management. The Dung Quat Refinery (DQR) construction project is a gr eat and vital grassroots refining construction project in Viet Nam. DQR project is located in Dung Quat Economic Zone, Binh Son Distric, Qu ang Ngai province. Total cost estimation is around 2.5 billions USD, 100% invested by Vietnamese Government through Petrovietnam. Th e construction phase was started in 2005 and planned to complete on 2009. Regretfully, th e refinery could not be finished within intended time, budget and resources. Until now, whole refinery has not passed a ll performance tests yet. Normally, time delay always happene d in big construction projects in Vietnam. With the purpose to solve this problem, it was found that several approaches have been affected pr oject time completion. There are many factors found as the major source lead ing to manage project time completion affectively. This report summarized the delay ca uses factors involved in the Dung Quat Refinery project during construc tion stage. This research will be conducted by using qualitative research, the data will be collected to analyze the facing problems. It was discovered from this study that there were many factors causing project time delays in the project. From the case study, effective solutions for controlling the de lays will be investigated and be proposed for precious experiencesto co ntrol and prevent delays in other construction projects in the future.
Year2009
Corresponding Series Added EntryAsian Institute of Technology. Project ; no. CM-09-39
TypeProject
SchoolSchool of Engineering and Technology (SET)
DepartmentDepartment of Civil and Infrastucture Engineering (DCIE)
Academic Program/FoSConstruction Engineering and Infrastructure Management (CM)
Chairperson(s)Hadikusumo, Bonaventura, H. W.
Examination Committee(s)Chotchai Charoenngam ;Chiu, Gregory, L. F.
Scholarship Donor(s)Petro-Vietnam
DegreeProject (M. Eng.) - Asian Institute of Technology, 2009


Usage Metrics
View Detail0
Read PDF0
Download PDF0