1 AIT Asian Institute of Technology

Application of FIDIC contract in bridge project: a case study of Can Tho Bridge construction project

AuthorNguyen, Thu Trang
Call NumberAIT Proj. no.MPM-CM-10-08
Subject(s)Bridges--Vietnam--Design and construction
Consulting engineers--Vietnam

NoteA project report submitted in partial fulfillment of the requirements for the Degree of Master of Engineering (Professional) in Construction Engineering and Infrastructure Management, School of Engineering and Technology
PublisherAsian Institute of Technology
Series StatementProject ; no. MPM-CM-10-08
AbstractOfficial Development Assistance fund (ODA) has brought a major change for transportation infrastructure system in Vietnam, starting in the early '90s. Rural transport systems, provincial roads and national highways, expressways, major bridges has really brought a new face for the transportation system, connecting and promoting the economic development of many regions nationwide. The management and effective use of these funds are the issues that the Government always attaches importance because it not only brings economic and social efficiency, but also to create credibility with donors as ODA loans to low interest rates with aimed at "Development Assistance".
Year2010
Corresponding Series Added EntryAsian Institute of Technology. Project ; no. MPM-CM-10-08
TypeProject
SchoolSchool of Engineering and Technology (SET)
DepartmentDepartment of Civil and Infrastucture Engineering (DCIE)
Academic Program/FoSConstruction Engineering and Infrastructure Management (Professional Master) (MPM-CM)
Chairperson(s)Chotchai Charoenngam;
Examination Committee(s)Hadikusumo, Bonaventuna H.W. ;Santi Charoenpornpattana;
DegreeProject (M. Eng.) - Asian Institute of Technology, 2010


Usage Metrics
View Detail0
Read PDF0
Download PDF0