1 AIT Asian Institute of Technology

Analysis of developer's misttakes in appraisal, approval and permit issuance of the construction investment project in Ho Chi Minh City

AuthorNguyen Thi Thu Nga
Call NumberAIT Proj. no.MPM-CM-11-36
Subject(s)Construction industry--Vietnam--Ho Chi Minh--Management
Construction industry--Vietnam--Ho Chi Minh--Quality control

NoteA Project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction Engineering and Infrastructure Management, School of Engineering and Technology
PublisherAsian Institute of Technology
Series StatementProject ; no. MPM-CM-11-36
AbstractFor construction investment projects, the investment project time of performance directly affects the investment efficiency. However, in the recent years, in Vietnam, the management and the control of “the time of performing construction investment project in Vietnam” has not been interested in and strictly managed, thus leading to many projects delayed in a long time, badly affecting the economic development and social living, especially as for projects using State budgets. Accordingly, the time of performing the procedures of submitting and approving investment project documents and asking for the permit of constructing the project is always troubling the heads of investors and spends so much time. Thus, it seems challenge for project management consultant, the owner, especially to the foreign investors! On PMC aspect, how to ensure reducing the time for doing project procedures is one of the critical points that I focus to study. My research is based on surveys about the normal problems on approvals and permit phase of the construction project. This assessment is studied together with theory application for the process, procedure of the construction investing projcet approval and construction permit, the regulation compliance in the construction; What to be prepared, done shall be systemized as a well being prepared for future projects and a contribution to improve overall the quality of the construction project document through approval and permit phase.
Year2011
Corresponding Series Added EntryAsian Institute of Technology. Project ; no. MPM-CM-11-36
TypeProject
SchoolSchool of Engineering and Technology (SET)
DepartmentDepartment of Civil and Infrastucture Engineering (DCIE)
Academic Program/FoSConstruction Engineering and Infrastructure Management (Professional Master) (MPM-CM)
Chairperson(s)Chotchai Charoenngam;
Examination Committee(s)Hadikusumo, Bonaventuna H.W. ;Santi Charoenpornpattana;
DegreeProject (M. Eng.) - Asian Institute of Technology, 2011


Usage Metrics
View Detail0
Read PDF0
Download PDF0