Selection of pipe jacking method for the second environmental sanitation project in Ho Chi Minh city based on soil characterization results | |
Author | Doi Si Thanh |
Call Number | AIT RSPR no.PME-GEM-15-04 |
Subject(s) | Engineering geotechnical. Piping Sanitation Underground pipelines |
Note | A research submitted in partial fulfillment of the requirements for the Degree of Master of Engineering (Professional) in Geotechnical and Earth Resources Engineering with area of Specialization in Geotechnical Engineering and Management. |
Publisher | Asian Institute of Technology |
Series Statement | |
Abstract | This study consist s of two main points of words. Firstly, soil characterization along the alignment sewer of the second environmental sanitation project of Ho Chi Minh City was made. Secondly, types of shield tunnel boring machine were reviewed, subsequently, the suitable type of shield machine for use in t he second environmental sanitation project in Ho Chi Minh City was identified and the jack forces were provided. |
Year | 2016 |
Corresponding Series Added Entry | |
Type | Research Study Project Report (RSPR) |
School | School of Engineering and Technology (SET) |
Department | Department of Civil and Infrastucture Engineering (DCIE) |
Academic Program/FoS | Geotechnical Engineering and Management (Master Engineering (Professional)) (PME - GEM) |
Chairperson(s) | Noppadol Phien - Wej |
Examination Committee(s) | Pham Huy Giao;Sutisuk Soralump |
Scholarship Donor(s) | FECON Foundation Engineering and Underground Construction JSC, Vietnam |
Degree | Research report (M. Eng.) - Asian Institute of Technology, 2016 |