1
Develop a simulation model for a cost-based selective maintenance policy with time-window constraint | |
Author | Nguyen Xuan Tinh |
Call Number | AIT Thesis no.ISE-10-28 |
Subject(s) | Maintenance--Cost of operation Maintenance |
Note | A master project report submitted in partial fulfillment of the requirements for the degree of Professional Master of Engineering in Industrial Engineering and Management, School of Engineering and Technology |
Publisher | Asian Institute of Technology |
Series Statement | Thesis ; no. ISE-10-28 |
Abstract | This research project studied the selective maintenance policy with one failure mode of components/equipments based on the ages of the components/equipments in a serial system. In this type of policy, the system will be maintained in a short period before the next operation period. In the fixed maintenance period, there are only some equipments chosen for maintenance in such a way that the system maintenance cost which consists of preventive maintenance cost and repair cost will be minimized. This problem is addressed in this research project through simulation technique. A simulation program has been developed for the serial system based an @Risk and then @RiskOptimizer was employed to help find solution for the cost minimization model Numerical experiments and sensitivity analysis are also conducted to illustrate the applicability of the models. |
Year | 2010 |
Corresponding Series Added Entry | Asian Institute of Technology. Thesis ; no. ISE-10-28 |
Type | Thesis |
School | School of Engineering and Technology (SET) |
Department | Department of Industrial Systems Engineering (DISE) |
Academic Program/FoS | Industrial Systems Engineering (ISE) |
Chairperson(s) | Voratas Kachitvichyanukul |
Examination Committee(s) | Huynh Trung Luong |
Scholarship Donor(s) | Petro Vietnam |
Degree | Thesis (M.Eng.) - Asian Institute of Technology, 2010 |