1 AIT Asian Institute of Technology

World Bank tendering and contract administration procedure : a case study of Trung Son Hydropower Project

AuthorNgo Viet Hoang
Call NumberAIT Proj. no.MPM-CM-12-25
Subject(s)World Bank--Vietnam
Construction contracts--Vietnam
Economic assistance--Vietnam

NoteA Project submitted in partial fulfillment of the r equirements for the degree of Master of Science (Professional) in Construction Engineering and Infrastructure Management, School of Engineering and Technology
PublisherAsian Institute of Technology
Series StatementProject ; no. MPM-CM-12-25
AbstractThe economic growth over several years is at the root of many of the issues in Vietnam's energy sector. It lead to the government must have a plan to develop the power generation. Vietnam's options for power generation include a hydropower, sizable resources of coal and gas, renewable energy potential of possibly as well as some nuclear power. From an emissions standpoint, every source that displaces coal from the generation mix would reduce emissions of both local pollutants including sulfur dioxide, oxides of nitrogen and particulates and global pollutants, especially carbon dioxide (C02). And Development of hydropower could have a decisive impact on Vietnam's future emissions path, since it will avoid building new coal fired plant. Hydropower represents one of the lowest cost sources of new power supply and Vietnam is constructing the Son La (2,400MW) and developing the Lai Chau (1,200MW) large plants on the Da River, adding to the current facility at Hoa Binh (1,920MW). Besides these large projects, the main focus is on medium-sized projects (typically 100-600 MW each) distributed throughout the country. About 22 such projects are under construction or are planned to enter construction over the next decade, providing a total of about 4,800 MW. Trung Son hydropower project is the first hydropower project that's funded by World Bank, and its processes must follow the World Bank guideline. It's the challenge for entire member of Trung Son hydropower company. Especially, in contract administration. How to avoid the threat of delay(time), over budget(cost), uncetain risk of construction(quality) is the big question. Through this final report,the author hope everyone, who read it, can find out their own way to solve the edges related to contract administration problems in the difference projects.
Year2012
Corresponding Series Added EntryAsian Institute of Technology. Project ; no. MPM-CM-12-25
TypeProject
SchoolSchool of Engineering and Technology (SET)
DepartmentDepartment of Civil and Infrastucture Engineering (DCIE)
Academic Program/FoSConstruction Engineering and Infrastructure Management (Professional Master) (MPM-CM)
Chairperson(s)Hadikusumo, Bonaventura H.W.;
Examination Committee(s)Chotchai Charoenngam;Oulawan Kulchartchai;
Scholarship Donor(s)Asian Institute of Technology Fellowship;
DegreeProject (M. Sc.) - Asian Institute of Technology, 2012


Usage Metrics
View Detail0
Read PDF0
Download PDF0