1
| Risks and cost escalation of undergroup construction package of highrise building | |
| Author | Bien Nam Hai | 
| Call Number | AIT Proj. no.MPM-CM-13-09 | 
| Subject(s) | Tall buildings--Risk assessment | 
| Note | A thesis submitted in partial fulfillment of the requirements for the Degree of Professional Master of Project Management in Construction Engineering and Infrastructure Management, School of Engineering and Technology | 
| Publisher | Asian Institute of Technology | 
| Series Statement | Project ; no. MPM-CM-13-09 | 
| Abstract | This study, which refers to the theories and the standards system, has expressed the concept of cost estimation, cost control, cost risks and escalation of underground construction package of high - rise building The next part of this report is the case stu dy of Commercial Center, Textile Fabrics, Department Store and Apartment project , study cost estimation and cost escalation of the basement of high - rise building. This is also the objective of this study. | 
| Year | 2013 | 
| Corresponding Series Added Entry | Asian Institute of Technology. Project ; no. MPM-CM-13-09 | 
| Type | Project | 
| School | School of Engineering and Technology (SET) | 
| Department | Department of Civil and Infrastucture Engineering (DCIE) | 
| Academic Program/FoS | Construction Engineering and Infrastructure Management (Professional Master) (MPM-CM) | 
| Chairperson(s) | Hadikusumo, Bonaventuna H. W.; | 
| Examination Committee(s) | Santi Charoenpornpattana; | 
| Degree | Project (M. Eng.) - Asian Institute of Technology, 2013 |