Integer programming approach to solving the time-cost Tradeoff problem in construction

AuthorPaitoon Visanuyothin
Call NumberAIT Thesis no.ST-00-47
Subject(s)Critical path analysis
Integer programming
Construction industry--Management

NoteA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering.
PublisherAsian Institute of Technology
AbstractTime-cost tradeoff analysis has been developed to support CPM for a long time. There have been many approaches proposed for the time-cost tradeoff analysis but those are not successfully accepted in the construction industry yet. The main objective of this study is to propose a new approach for time-cost tradeoff analysis. The new approach is based on Integer Programming (IP), which is a powerful tool for obtaining optimum results. Nine examples of time-cost tradeoff problem from various sources with different approaches used were taken and solved again by the new approach, named (-1 )-0-1 IP Approach. All results produced by the (-1 )-0-1 IP Approach were proved to be the same or better than results of those original approaches. This study also developed a computer program based on the (-1 )-0-1 IP Approach to facilitate its use. This study can be applied in construction resource selection before making a construction plan, which includes not only information on normal costs and normal durations but also crash costs and crash durations .
Year2000
TypeThesis
SchoolSchool of Engineering and Technology (SET)
DepartmentDepartment of Civil and Infrastucture Engineering (DCIE)
Academic Program/FoSStructural Engineering (STE) /Former Name = Structural Engineering and Construction (ST)
Chairperson(s)Manavazhi, Raj;
Examination Committee(s)Chotchai Charoenngam;Barry, William Joseph ;
Scholarship Donor(s)Asian Institute of Technology Partial Scholarship;
DegreeThesis (M.Eng.) - Asian Institute of Technology, 2000