1 AIT Asian Institute of Technology

Evaluation of environmental impact mitigation plan (EIMP) on Pak Mun and lam Takhong hydropower projects

AuthorKitti Chinshed
Call NumberAIT Thesis no.ST-00-57
Subject(s)Pak Mun Hydropower Project
Lam Takhong Hydropower Project

NoteA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering.
PublisherAsian Institute of Technology
AbstractAn Environmental Impact Mitigation Plan (EIMP) is important to reduce negative impacts of hydrop6wer project development in Thailand. This study selected Pak Mun and Lam Takhong projects as case studies to find out causes of problems, ways to improve and propose guidelines for EIMP in future projects. Data was collected from news, television programs, internet and surveys of opinions of involved parties between October 1999 and January 2000. Both projects have some inappropriate processes during planning, and implementation stage. Mainly lack of public involvement in planning, inadequate databases, ineffective public relations. Future EIMP should increase public participation in planning and implementation stages and provide programs to improve long-term quality of life of affected people.
Year2000
TypeThesis
SchoolSchool of Engineering and Technology (SET)
DepartmentDepartment of Civil and Infrastucture Engineering (DCIE)
Academic Program/FoSStructural Engineering (STE) /Former Name = Structural Engineering and Construction (ST)
Chairperson(s)Watanabe, Tsunemi ;
Examination Committee(s)Chotchai Charoenngam;Tawatchai Tingsanchali;
Scholarship Donor(s)Electricity Generating Authority of Thailand;
DegreeThesis (M.Eng.) - Asian Institute of Technology,2000


Usage Metrics
View Detail0
Read PDF0
Download PDF0