1
Short-term hydro-thermal coordination for the Vietnamese power system | |
Author | Nguyen Thanh Vinh |
Call Number | AIT Thesis no.ET-03-9 |
Subject(s) | Electric power systems -- Vietnam Hydrothermal electric power systems |
Note | A thesis submitted in pa1tial fulfillment of the requirements for the degree of Master of Engineering. |
Publisher | Asian Institute of Technology |
Series Statement | Thesis ; no. ET-03-9 |
Abstract | In this thesis, the short-term hydrothermal coordination with planning horizon ranging from one day to one week is used to minimize the total generator fuel cost of thennal units of the Vietnamese power system, subject to hydrological constraints of the hydro power plants and operational constraints of the thermal power plants. The short-te1m hydrothermal coordination is solved by LINGO optimization software, which is based on branch-and-bound method for solving mixed integer linear programming. The solution obtained from LINGO software results in lower total cost than that obtained from GAMS optimization software based on branch-and-bound and cutting plane for solving mixed integer programming, leading to a substantial fuel cost savings. |
Year | 2003 |
Corresponding Series Added Entry | Asian Institute of Technology. Thesis ; no. ET-03-9 |
Type | Thesis |
School | School of Environment, Resources, and Development (SERD) |
Department | Department of Energy and Climate Change (Former title: Department of Energy, Environment, and Climate Change (DEECC)) |
Academic Program/FoS | Energy Technology (ET) |
Chairperson(s) | Weerakorn Ongsakul |
Examination Committee(s) | Surapong Chirarattananon ;Mithulananthan, Nadarajah |
Scholarship Donor(s) | Electricity of Vietnam |