1 AIT Asian Institute of Technology

Production planning for small and medium-sized enterprises : a case study

AuthorChotiros Poowarat
Call NumberAIT Thesis no. ISE-01-22
Subject(s)Production planning
Small business

NoteA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Advanced Technologies
PublisherAsian Institute of Technology
Series StatementThesis ; no. ISE-01-22
AbstractThis thesis study presents an effective way to solve the production-planning problem of a furniture company in Thailand. Two Linear Programming models are formulated subject to the plant attributes and management policies. The procedures for this problem are divided into two steps. Firstly, the work started with the Linear Programmimg model for medium-range planning was applied to solve for weekly plan. Secondly, Linear Programming model for short-range planning model was applied to solve for daily plan. These procedures are implemented using the Microsoft Excel spreadsheet as the interface, with the optimization software, LINGO 5. Sensitivity analysis was performed with the variation of input parameter and some recommendations were proposed for the management to make production planning more efficient and realistic.
Year2001
Corresponding Series Added EntryAsian Institute of Technology. Thesis ; no. ISE-01-22
TypeThesis
SchoolSchool of Advanced Technologies (SAT)
DepartmentDepartment of Industrial Systems Engineering (DISE)
Academic Program/FoSIndustrial Systems Engineering (ISE)
Chairperson(s)Voratas Kachitvichyanukul;
Examination Committee(s)Anulark Techanitisawad;Bohez, Erik L.J. ;
DegreeThesis (M.Eng.) - Asian Institute of Technology, 2001


Usage Metrics
View Detail0
Read PDF0
Download PDF0