Risk analysis for Build-Operate-Transfer (BOT) Power Projects in Vietnam : a case study of | |
Author | Ha Minh Man |
Call Number | AIT RSPR no.SM-04-92 |
Subject(s) | Risk assessment--Vietnam Build-Operate Transfer Power Projects--Finance |
Note | A research study submitted in partial fulfillment of the requirements for the degree of Master of Business Administration, School of Management |
Publisher | Asian Institute of Technology |
Series Statement | Research studies project report ; no. SM-04-92 |
Abstract | This study tries to analysis the situation of BOT project in power sector in Vietnam. From that, the study highlights some constraints regarding to BOT legal framework or local powerful players, which prevent developing of foreign invested BOT power project. This study also tries to analysis the case study: Phu My 3 BOT power project regarding the risks aspects. Additional, the study compares the risk allocation between Laibin B BOT power project and Phu My 3 power project to highlight the risks allocated into all the participants such as the host government, sponsor, contractor, lenders and insurers. The result illustrates that sponsor and contractor are responsible for construction and operation risk; the host government takes market and financial risk; finally, insurer takes all residual risks. Finally, some lessons learned for the risk allocation in BOT project illustrated in the conclusion part. |
Year | 2004 |
Corresponding Series Added Entry | Asian Institute of Technology. Research studies project report ; no. SM-04-92 |
Type | Research Study Project Report (RSPR) |
School | School of Management |
Department | Other Field of Studies (No Department) |
Academic Program/FoS | Master of Business Administration (MBA) (Publication code=SM) |
Chairperson(s) | Do Ba Khang; |
Examination Committee(s) | Tang, John C. S. ;Kouwenberg, Roy; |
Scholarship Donor(s) | Government of France ;AIT Fellowship ; |
Degree | Research Studies Project Report (M. BA.) - Asian Institute of Technology, 2004 |