A feasibility study of a water supply project

AuthorTrinh Cong Binh
Call NumberAIT Proj. no.MPM-CM-19-07
Subject(s)Water-supply--Vietnam--Management
Water-pipes--Design and construction

NoteA project submitted in partial fulfillment of the requirements for the degree of Master of Engineering (Professional) in Construction Engineering and Infrastructure Management
PublisherAsian Institute of Technology
AbstractThe Eastern road segment from foot of Phu My bridge within District 2 and District 7 territory to Rach Chiec bridge within District 2 and District 9 territory is situated in the eastern gateway of the city. It is obvious that the implementation of the project "Installation of level 1 water pipelines along Ring Road No.2 (from Provincial Road No.25B to Phu My Bridge) - District 2, District 7" is essential and of high feasibility. Therefore, the State Agencies have required many difficult and complex problems of legal, construction and schedule, technical and design, operation and maintenance, and finance to obtain agreement on the location of level 1 water pipelines along Ring Road No.2.
Year2019
TypeProject
SchoolSchool of Engineering and Technology (SET)
DepartmentDepartment of Civil and Infrastucture Engineering (DCIE)
Academic Program/FoSConstruction Engineering and Infrastructure Management (Professional Master) (MPM-CM)
Chairperson(s)Hadikusumo, Bonaventura H.W.;
Examination Committee(s)Chotchai Charoenngam;Wasan Teerajetgul;
DegreeProject (M. Eng.) - Asian Institute of Technology, 2019


Usage Metrics
View Detail0
Read PDF0
Download PDF0