Analysis of static and dynamic pile testing data for a location in Phetchaburi, Bangkok

AuthorMarasinghe, Marasinghe A.M.G.
Call NumberAIT Caps. Proj. no.CIE-18-60
Subject(s)Piling (Civil engineering)--Testing

NoteA capstone project report submitted in partial fulfillment of the requirements for the degree of Bachelor of Science in Engineering Civil and Infrastructure Engineering
PublisherAsian Institute of Technology
Series StatementCaps. Proj. ; no. CIE-18-60
AbstractDevelopment of the construction field an increasing higher loads from the tall buildings, the piling testing is more essential in the Bangkok region. For that incident introducing more conventional pile testing to determine the pile capacities and settlement of the pile. Currently two different kind test methods used in pre-stressed and driven pre-cast reinforcement con- crete piles. Those test are mainly called dynamic and static load test. In practically these test results are more over and over again impossible to do due to only one method will be used in per construction site. This research investigation presents a case study that have been used in both methods and results as a compared. The test results indicated that dynamic test results associated identical well with static load test results. The test results proved that dynamic pile load is less time consuming and less expensive compared to static load test.
Year2018
Corresponding Series Added EntryAsian Institute of Technology. Caps. Proj. ; no. CIE-18-60
TypeCapstone Project
SchoolSchool of Engineering and Technology (SET)
DepartmentDepartment of Civil and Infrastucture Engineering (DCIE)
Academic Program/FoSCivil and Infrastructure Engineering (CIE)
Chairperson(s)Pham Huy Giao;
Examination Committee(s)Duc Hoang Nguyen;
DegreeCapstone Project (B.Sc.)-Asian Institute of Technology, 2018