1 AIT Asian Institute of Technology

Assessment of HEC-HMS model to simulate river discharge : a case of Wangchu River Basin in Bhutan

AuthorWangchuk, Sonam
Call NumberAIT Caps. Proj. no.CIE-16-01
Subject(s)Geographic information system--Bhutan--Wangchu River Basin
Hydrology--Bhutan--Wangchu River Basin
Runoff--Bhutan--Wangchu River Basin

NoteA capstone project report submitted in partial fulfillment of the requirements for the degree of Bachelor of Science in Engineering Civil And Infrastructure Engineering, School of Engineering and Technology
PublisherAsian Institute of Technology
Series StatementCaps. Proj. ; no. CIE-16-01
AbstractThe use of HEC-HMS (Hydrological Engineering Center, Hydrological Modeling System) is not very commonly used applied in Bhutan. This paper attempts to present the simulation of river discharge for the Wangchu river basin in Bhutan using HEC-HMS. The DEM (Digital Elevation Model) resolution of 90 x 90 meters was obtained from the National Land Commission Secretariat of Bhutan. The watershed delineation, DEM recon- ditioning, terrain processing and basin model were processed using ArcHydro and HEC- HMS. The observed meteorological data obtained from the DoHS, MOEA, Bhutan was used to calibrate and validate the model.
Year2016
Corresponding Series Added EntryAsian Institute of Technology. Caps. Proj. ; no. CIE-16-01
TypeCapstone Project
SchoolSchool of Engineering and Technology (SET)
DepartmentDepartment of Civil and Infrastucture Engineering (DCIE)
Academic Program/FoSCivil and Infrastructure Engineering (CIE)
Chairperson(s)Shrestha, Sangam;
Examination Committee(s)Shinde, Victor;
DegreeCapstone Project (B.Sc.)-Asian Institute of Technology, 2016


Usage Metrics
View Detail0
Read PDF0
Download PDF0