1
Lead time estimation in MRPII for assembly operations : a case study of Vietronic DongDa | |
Author | Dao Thi Minh |
Call Number | AIT Thesis no. ISE-97-13 |
Subject(s) | Production scheduling--Vietnam |
Note | A thesis submitted in partial fulfilment of the requirements for the degree of Master of Engineering, School of Advanced Technologies |
Publisher | Asian Institute of Technology |
Series Statement | Thesis ; no. ISE-97-13 |
Abstract | This study concerns estimating the manufacturing lead time, which is not computed automatically in MRPII. The problem of estimating and improving the manufacturing lead time for shop floor of Viettronic DongDa Company (Hanoi, Vietnam) is investigated as a case study. The solution of the problem is found through using CAN-Q queueing software and an algorithm, which is written to interface between CAN-Q and data files in MICRO MAX, to estimate the manufacturing lead time of the finished product (television in this study). At the same time, this estimate is compared with the lead time in simulation and the difference between them is analysed in this study. |
Year | 1997 |
Corresponding Series Added Entry | Asian Institute of Technology. Thesis ; no. ISE-97-13 |
Type | Thesis |
School | School of Advanced Technologies (SAT) |
Department | Other Field of Studies (No Department) |
Academic Program/FoS | Industrial Systems Engineering (ISE) |
Chairperson(s) | Bohez, Erik L.J.; |
Examination Committee(s) | Pandey, P.C.;Anulark Pinnoi; Hasin, M. Ahsan Akhtar; |
Scholarship Donor(s) | Government of Belgium; |
Degree | Thesis (M.Eng.) - Asian Institute of Technology, 1997 |