Project scheduling planning and control system for a large scale project :|ba case study of Pah-Sak Dam Project | |
Author | Nattaset Thirawattanakorn |
Call Number | AIT Thesis no.ST-97-39 |
Subject(s) | Scheduling (Management) Pah-Sak Dam Project |
Note | A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering. |
Publisher | Asian Institute of Technology |
Series Statement | Thesis ; no. ST-97-39 |
Abstract | As the large scale projects usually involve many complicated activities, the effective schedule planning and control system is one of the most crucial subjects for the project accomplishment. The case study of large scale project, Pah-Sak Dam project, was conducted to examine effectiveness of its existing schedule planning and control system. Data from three management levels (i.e., executive, project, and field) was gathered through personal interviews and the related documents. Results demonstrate: (a) Effectiveness of schedule planning and control process, (b) information organization and routing (i.e., procedure of schedule and cost reporting, suitability of the rep01t contents for each management level), and (c) effectiveness of scheduling techniques (i.e. tools and software). The recommendations focusing on the system improvement are also presented. |
Year | 1997 |
Corresponding Series Added Entry | Asian Institute of Technology. Thesis ; no. ST-97-39 |
Type | Thesis |
School | School of Engineering and Technology (SET) |
Department | Department of Civil and Infrastucture Engineering (DCIE) |
Academic Program/FoS | Structural Engineering (STE) /Former Name = Structural Engineering and Construction (ST) |
Chairperson(s) | Chotchai Charoenngam |
Examination Committee(s) | Baba, Keizo;Wijeyewickrema, Anil C. |
Scholarship Donor(s) | Government of Japan. |
Degree | Thesis (M. Eng.) - Asian Institute of Technology, 1997 |