1
Multiattribute decision making approach to facility layout for a diesel engine plant | |
Author | Kochoke Poonikom |
Call Number | AIT RSPR no. ISE-96-02 |
Subject(s) | Plant layout Multiple criteria decision making |
Note | A research study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Advanced Technologies |
Publisher | Asian Institute of Technology |
Series Statement | Research studies project report ; no. ISE-96-02 |
Abstract | The objective of this study is developed to construct departmental locations within a facility to use multi-criteria approach. ·In this study, the proposed constructive model, base on saaty's Analytical Hierarchy Process, rates the set of pairs of potentially adjacent departments with respect to both qualitative and quantitative criteria. Moreover, the application of the model for this study, computer program are used. The software for AHP techniques (Expert Choice), incorporating a modified AHP portion and a layout construction model, was developed to facility layout problem. The effectiveness of the approach and the software is applied to this case study. In addition, the sensitivity analysis of this case study will be activated respect to restriction of saaty' s approach By using this model frame, a case study is VIKYNO factory where diesel engines are manufactured in Vietnam country. |
Year | 1996 |
Corresponding Series Added Entry | Asian Institute of Technology. Research studies project report ; no. ISE-96-02 |
Type | Research Study Project Report (RSPR) |
School | School of Advanced Technologies (SAT) |
Department | Department of Industrial Systems Engineering (DISE) |
Academic Program/FoS | Industrial Systems Engineering (ISE) |
Chairperson(s) | Pandey, P. C.; |
Examination Committee(s) | Nagarur, N. N.;Anulark Pinnoi; |
Scholarship Donor(s) | Royal Thai Governor; |
Degree | Research Studies Project Report (M.Eng.) - Asian Institute of Technology, 1996 |