Multi-project multi-resource scheduling : a case study of EGAT

AuthorPrayoon Patana-anake
Call NumberAIT Thesis no. IE-90-20
Subject(s)Industrial project management--Case studies
Electric lines
NoteA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
PublisherAsian Institute of Technology
AbstractThis thesis pertains to the study multi-project multi - resource scheduling problem. A case of study is taken up from Electricity Generating Authority of Thailand (EGAT ) . The specific problem considered h ere is of transmission line projects. Three projects, each requiring eight difference types of resources have been studied. The Best-first search methodology is applied h ere which is adopted from a recent paper. However , the adjustment is done to make the proposed methodology capable to manage the multi- project problem and also to use the advantage of heuristic method. The program in this thesis is written in LISP language in order to suit the methodology . A comparison of heuristic method a nd optimizing method is presented. By applying the methodology , the sensitivity analysis with respect to resource additions and time variations are done. In time variation analysis some assumptions are required to be made so that it can be analyzed by using the methodology developed. Further study on Cost-Benefit analysis of the proposed resources has been reported by varying the interest rates with fixed inflation rate.
Year1990
TypeThesis
SchoolSchool of Engineering and Technology (SET)
DepartmentOther Field of Studies (No Department)
Academic Program/FoSIndustrial Engineering (IE)
Chairperson(s)Vrat, Prem
Examination Committee(s)Tang, John C.S. ;Fujiwara, Okitsugu
Scholarship Donor(s)Government of Australia
DegreeThesis (M.Eng.) - Asian Institute of Technology, 1990


Usage Metrics
View Detail0
Read PDF0
Download PDF0