1 AIT Asian Institute of Technology

Nitrogen and phosphorus removal in intermittent activated sludge process

AuthorLin, Li
Call NumberAIT Thesis no. EV-88-14
Subject(s)Sewage--Purification--Phosphate removal
Sewage--Purification--Nitrogen removal
Sewage--Purification--Activated sludge process

NoteA Thesis submitted in partial fulfillment of the requirements for the degree of Master of Science, School of Environment, Resources and Development
PublisherAsian Institute of Technology
AbstractThe effect of aeration time and SRT on nutrient removal in IAS process was studied by using actual sewage in four laboratory scale reactors. Different aeration time, aeration strength and SRT was tested. The results from the study show nitrogen and phosphorus as well as organic material s can be removed at the same time by controlling aeration time, aeration strength and SRT using !AS process. Minimum anaerobic period, aerobic period and air flow rate were determined. Optimum aeration time, strength and SRT were identified. The possibility of using kinetic coefficient to predict phosphorus removal rate was studied.
Year1988
TypeThesis
SchoolSchool of Environment, Resources, and Development
DepartmentDepartment of Energy and Climate Change (Former title: Department of Energy, Environment, and Climate Change (DEECC))
Academic Program/FoSEnvironmental Engineering and Management (EV)
Chairperson(s)Yamamoto, K. ;
Examination Committee(s)Ahn, Kyu-Hong ;Kriengsak Udomsinrot ;
Scholarship Donor(s)Australian Government ;
DegreeThesis (M.Sc.) - Asian Institute of Technology, 1988