1 AIT Asian Institute of Technology

Optimal capacity for a multipurpose reservoir

AuthorYeong, Chang Ji
Call NumberAIT RSPR no. IE-87-5
Subject(s)Reservoirs
NoteA research study report submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
PublisherAsian Institute of Technology
AbstractA chance constrained mod el is opti mal capacity, monthl y release and for a multipurpo se reservoir that hydropower generation. developed to determine the h ydropower plant capacity maxi miz es net benefit from In this model, ( i> the reliability of the minimal storage level for the hydropower generation is considered as a decision variable and this makes the expected energy production function very accura te; (ii) a Monte Caro si mul ation is e mplo yed to generate correlated monthly flows and to calculate the quantiles of cumulative flow distribution. The model is Narat hiwat Province, applied Thailand, to the Sai Buri dam project in and the results are presented.
Year1987
TypeResearch Study Project Report (RSPR)
SchoolSchool of Engineering and Technology (SET)
DepartmentOther Field of Studies (No Department)
Academic Program/FoSIndustrial Engineering (IE)
Chairperson(s)Fujiwara, Okitsugu
Examination Committee(s)Clarke Harry R. ;Suphat Vongvisessomjai
Scholarship Donor(s)Deutscher Akademischer Austauschdienst(DAAD) Government of Federal Republic of Germany
DegreeResearch Studies Project Report (M. Eng.) - Asian Institute of Technology, 1987


Usage Metrics
View Detail0
Read PDF0
Download PDF0