1
Construction planning for the placing of large quantities of concrete | |
Author | Arif, Kamal Abdullah |
Call Number | AIT Thesis no.ST-87-2 |
Subject(s) | Construction industry--Planning Concrete construction |
Note | A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology |
Publisher | Asian Institute of Technology |
Abstract | This study is attempted to identify the problems and to explore the more advanced of technical know - how involved in the process of large concreting work. The operational sequence, placement methods and the factors which influence the progress of concreting work on various construction projects are analysed . The types of construction included in this study are dams, bridge, underground power - ho use a nd high - rise building. Comparisons of the results has shown that the continuous placement method yield the better output in placing of large amounts of concrete, especially for massive reinforced concrete structures. However, this method is still not widely accepted in many construction projects. It is recommended that further study be conducted on the possibility of using this method specifically for dams, underground and under water structures as well as mass foundations. Finally, a proposed planning mode land some relevant check lists are given as to provide construction planning for the placing of large quantities of concrete more meaningful . |
Year | 1987 |
Type | Thesis |
School | School of Engineering and Technology (SET) |
Department | Other Field of Studies (No Department) |
Academic Program/FoS | Structural Engineering (STE) /Former Name = Structural Engineering and Construction (ST) |
Chairperson(s) | Pichai Nimityongskul ;Ping Kunawatsatit |
Examination Committee(s) | Chauhan, Roshan Lal |
Scholarship Donor(s) | DAAD German Academic Exchange Service |
Degree | Thesis (M.Eng.) - Asian Institute of Technology, 1987 |