Contractor's algorithms through CPM networks for optimal financial policies

AuthorYang, Ming-kai
Call NumberAIT Thesis no.ST-86-32
Subject(s)Critical path analysis
Construction industry--Planning
NoteA thesis study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
PublisherAsian Institute of Technology
AbstractIn a CPM network of a construction project, some non critical activities normally exist and they can be shifted in such a way that the project can be more properly and economically executed by the contractor for a specific reason . This technique h as been developed a nd is termed as the well-known resource levelling by shifting the noncritical activities which also gives the contractor a chance to have a minimum financial cost or a minimum amount of fund tied up for a project. With this concept, the contractor may have better financial policies suitable algorithms have been developed in this study. Computer program has also been developed to avoid tedious manual computations and the study has been illustrated through examples.
Year1986
TypeThesis
SchoolSchool of Engineering and Technology (SET)
DepartmentOther Field of Studies (No Department)
Academic Program/FoSStructural Engineering (STE) /Former Name = Structural Engineering and Construction (ST)
Chairperson(s)Pichai Nimityongskul ; Jearkjirm, Vithool
Examination Committee(s)Ping Kunawatsatit ; Chauhan, Gopal
Scholarship Donor(s)German Academic Exchange Service (DAAD)
DegreeThesis (M.Eng.) - Asian Institute of Technology, 1986


Usage Metrics
View Detail0
Read PDF0
Download PDF0