Production planning models for a refractory production system

AuthorWisit Rutchatathiwat
Call NumberAIT RSPR no. IE-85-15
Subject(s)Production planning
NoteA research study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
PublisherAsian Institute of Technology
AbstractThis research study covers all production planning requirements for Refractory Plant . It includes production scheduling , raw material requirements planning, manpower planning, and plant capacity planning. Actually, these models are divided to three levels for different purpose of planning . The short-term plan is the lowest level to find the exact schedule of production . The medium-term plan is the level of preparing facilities for short-term plan. The long-term plan is for predicting the future and preparing facilities for the future. The scheduling model is a simulation model using real data . The medium-term and long-term production models are aggregate production model (APP) using linear programming technique to solve the problems. The manpower planning model uses a heuristic model to choose the best schedule of workers and number of workers required for each machine . The material requirements planning model use results of APP and the modification of MRP to solve the problem. The plant capacity planning is a part of APP model.
Year1985
TypeResearch Report
SchoolSchool of Engineering and Technology (SET)
DepartmentOther Field of Studies (No Department)
Academic Program/FoSIndustrial Engineering (IE)
Chairperson(s)Tabucanon, Mario T.
Examination Committee(s)Tang, John C.S. ;Lu, Iuan-Yuan
Scholarship Donor(s)Siam Cement Group
DegreeResearch Studies Project Report (M. Eng.) - Asian Institute of Technology, 1985


Usage Metrics
View Detail0
Read PDF0
Download PDF0