Production planning models for a refractory production system | |
Author | Wisit Rutchatathiwat |
Call Number | AIT RSPR no. IE-85-15 |
Subject(s) | Production planning |
Note | A research study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology |
Publisher | Asian Institute of Technology |
Abstract | This research study covers all production planning requirements for Refractory Plant . It includes production scheduling , raw material requirements planning, manpower planning, and plant capacity planning. Actually, these models are divided to three levels for different purpose of planning . The short-term plan is the lowest level to find the exact schedule of production . The medium-term plan is the level of preparing facilities for short-term plan. The long-term plan is for predicting the future and preparing facilities for the future. The scheduling model is a simulation model using real data . The medium-term and long-term production models are aggregate production model (APP) using linear programming technique to solve the problems. The manpower planning model uses a heuristic model to choose the best schedule of workers and number of workers required for each machine . The material requirements planning model use results of APP and the modification of MRP to solve the problem. The plant capacity planning is a part of APP model. |
Year | 1985 |
Type | Research Report |
School | School of Engineering and Technology (SET) |
Department | Other Field of Studies (No Department) |
Academic Program/FoS | Industrial Engineering (IE) |
Chairperson(s) | Tabucanon, Mario T. |
Examination Committee(s) | Tang, John C.S. ;Lu, Iuan-Yuan |
Scholarship Donor(s) | Siam Cement Group |
Degree | Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1985 |