Logistics for the construction of transmission systems | |
Author | Shiue, Cherng-feng |
Call Number | AIT RSPR no. IE-85-16 |
Subject(s) | Shipping--Taiwan--Rates Construction industry--Economic aspects--Taiwan |
Note | A research study submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology |
Publisher | Asian Institute of Technology |
Abstract | This research deals with a transportation problem of material parts in the field of construction of transmission systems, with particular reference to the Transmission and Distribution Construction (TDC) office of Taiwan Power Company (Taipower) . The problem ยท could be identified as a large "capacitated plant location problem". However, it was solved by a hierarchical approach, i.e., first, the parts allocation to each warehouse is deterimined by a mixed integer linear programming model; second, the minimum number of trucks and the specific load of each truck for each warehouse are determined by set covering model . A heuristic method and exact method for the set covering problem were studied, and it- was found that the heuristic method performed satisfactorily in this context. A case study of a transmission line construction project was made, showing the usefulness of the overall approach. |
Year | 1985 |
Type | Research Study Project Report (RSPR) |
School | School of Engineering and Technology (SET) |
Department | Other Field of Studies (No Department) |
Academic Program/FoS | Industrial Engineering (IE) |
Chairperson(s) | Oudheusden, Dirk L. Van |
Examination Committee(s) | Tabucanon, Mario T. ;Lu, Iuan-Yuan |
Scholarship Donor(s) | The Government of Republic of China |
Degree | Research Studies Project Report (M. Eng.) - Asian Institute of Technology, 1985 |