1 AIT Asian Institute of Technology

An integrated project management control system

AuthorYuh, Cherng
Call NumberAIT Thesis no.ST-85-33
Subject(s)Electronic data processing--Construction industry
Construction industry--Management
NoteA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology
PublisherAsian Institute of Technology
AbstractIn this study, the construction management tasks of project planning, scheduling, and controlling are discussed. A BASIC Micro-Computer program group for project schedule and control is also developed. Attention is concentrated on the project control system, based upon the Critical Path Method (activity of arrow) as the research topic. Data and relevant information of a building construction project were collected. The proposed integrated project management program is tested, and proves to be a very useful method for project management.
Year1985
TypeThesis
SchoolSchool of Engineering and Technology (SET)
DepartmentOther Field of Studies (No Department)
Academic Program/FoSStructural Engineering (STE) /Former Name = Structural Engineering and Construction (ST)
Chairperson(s)Pichai Nimityongskul ;Ping Kunawatsatit
Examination Committee(s)Carmichael, D.G.
Scholarship Donor(s)Republic of China (RSEA)
DegreeThesis (M.Eng.) - Asian Institute of Technology, 1985


Usage Metrics
View Detail0
Read PDF0
Download PDF0