1
Progress characteristics of piling work in construction | |
Author | Charnchai Chantararatn |
Call Number | AIT Thesis no. ST-84-05 |
Subject(s) | Piling (Civil engineering) |
Note | A thesis submitted in partial fulfilment of the requirements for the degree of Master of Engineering, School of Engineering and Technology |
Publisher | Asian Institute of Technology |
Abstract | In this study the causes of delay in piling work have been identified and solutions to the problems of delays from various construct ion projects suggested. Data and information have been collected and analyses. The results in the from of progress characteristics of piling work and statistical model of production of piling work for various for each type of piles under different surrounding conditions arc presented. Finally, improvements of piling work in construction are suggested. |
Year | 1984 |
Type | Thesis |
School | School of Engineering and Technology |
Department | Department of Civil and Infrastucture Engineering (DCIE) |
Academic Program/FoS | Structural Engineering (STE) /Former Name = Structural Engineering and Construction (ST) |
Chairperson(s) | Ping Kunawatsatit ; |
Examination Committee(s) | Chauhan, Roshan Lal ;Loo, Yew Chaye ;Pichai Nimityongskul ; |
Scholarship Donor(s) | The Royal Thai Air Force ; |
Degree | Thesis (M.Eng.) - Asian Institute of Technology, 1984 |