1 AIT Asian Institute of Technology

Construction management of Khao Laem Dam project

AuthorLee, Chen-fei
Call NumberAIT Thesis no.ST-83-08
Subject(s)Khao Laem Dam
Construction industry--Management
NoteA thesis submitted in partial fulfillment of the requirement for the degree of Master of Engineering, School of Engineering and Technology
PublisherAsian Institute of Technology
AbstractIn this study , the existing construction management for progress control , materials, manpower and equipment at the Khao Laem Dam project has been discussed . A computer analysis for manpower allocation has been carried out. Furthermore , a proposed model. for d am construction management has been presented . Field data and information for the project were collected. According the the collected data, the management of this project seems to have insufficient manpower but too old plant machinery. Nevertheless, the delivery and procurement of materials are very sound. It is found by a computer analysis that the distribution of resources for saving manpower are easily identified. For future use. a management model is developed which could be applied to similar projects. It is apparent from this study that computer application is an essential component in complex construction management.
Year1983
TypeThesis
SchoolSchool of Engineering and Technology
DepartmentDepartment of Civil and Infrastucture Engineering (DCIE)
Academic Program/FoSStructural Engineering (STE) /Former Name = Structural Engineering and Construction (ST)
Chairperson(s)Karasudhi, Pisidhi ;Ping Kunawatsatit
Examination Committee(s)Usami, Tsutomu
Scholarship Donor(s)Republic of China
DegreeThesis (M.Eng.) - Asian Institute of Technology, 1983


Usage Metrics
View Detail0
Read PDF0
Download PDF0