Model tests of prestressed cable-suspended roof with precast panels | |
Author | Yang, Li-chi |
Call Number | AIT Thesis no. ST-83-23 |
Subject(s) | Roofs, Suspension Prestressed construction |
Note | A thesis submitted in partial fulfillment of the requirement for the degree of Master of Engineering, School of Engineering and Technology |
Publisher | Asian Institute of Technology |
Abstract | A 1/10 scale model is built and tested to study the benaviour and the construct method tor a cable-suspended roof system. The new root system consists of a rectangular net of cables prestressed in only one direction. Temporary loading is applied before the precast root panels are Jointed. The subsequent removal of the temporary loads has a prestressing effect on the completed roof. This increases considerably the efficiency of the completed roof under service load condition. Experimental results confirm the efficiency of the new systems. A series of relevant pi-numbers are derived in this study. These will permit the prediction of the corresponding behaviour of the prototype, and are useful in the design of a real cable-suspended roof structure. FEAR81 was employed for analyzing the cable-suspended roof structure. Comparisons between the experimental and the analytical results indicate that the nonlinear characteristics of the roof system can be adequately predicted using the available cable and shell element subroutines. |
Year | 1983 |
Type | Thesis |
School | School of Engineering and Technology |
Department | Department of Civil and Infrastucture Engineering (DCIE) |
Academic Program/FoS | Structural Engineering (STE) /Former Name = Structural Engineering and Construction (ST) |
Chairperson(s) | Loo, Yew-Chaye |
Examination Committee(s) | Worsak Kanok-Nukulchai ;Karasudhi, Pisidhi |
Scholarship Donor(s) | Government of Republic of China |
Degree | Thesis (M.Eng.) - Asian Institute of Technology, 1983 |