1
COBA-model economic assessment of the Surat Thani by-pass, Thailand | |
Author | Sununt Gliengpradit |
Call Number | AIT Thesis no. GT- 79-43 |
Subject(s) | Highway bypasses--Economic aspects--Surat Thani |
Note | A thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering, School of Engineering and Technology |
Publisher | Asian Institute of Technology |
Abstract | The cost-benefit analysis computer program (COBA-8) was applied to evaluate the economic feasibility of the Surat Thani by-pass route in the Southern part of Thailand. Results of analysis show that the model can be applied for feasibility studies in Thailand with some modification. From the .study, the by-pass route would be a worth wile investment of national resources. The net present value of the project would be baht 127-million, with an internal rate of returri. of 34 percent. The pay-back period would be five years after completion of the road. The major source of transportation benefit would come from the reduction of road user costs. For road used, about two-thirds of the road-user benefits would come from vehicle operating cost saved, and the remainder from the value of travel time saved. |
Year | 1980 |
Type | Thesis |
School | School of Engineering and Technology |
Department | Department of Civil and Infrastucture Engineering (DCIE) |
Academic Program/FoS | Geotechnical and Transportation Engineering (GT) |
Chairperson(s) | Jones, John Hugh |
Examination Committee(s) | Marler, N.W. ;Vokes, Richard W. A. |
Scholarship Donor(s) | Department of Highways, Thailand |
Degree | Thesis (M. Eng.) - Asian Institute of Technology, 1980 |