Substitution of labour intensive methods in projects

AuthorMunir, Muhammad
Call NumberAIT Thesis no. 1331
Subject(s)Construction industry--Management
Construction industry--Labor productivity
NoteA thesis submitted in partial fulfillment of the requirements for the degree of Master of Engineering of the Asian Institute of Technology, Bangkok, Thailand
PublisherAsian Institute of Technology
AbstractThe purpose of this study is to compare alternative construction methods and feasibility of substituting labour - intensive methods for the capital-intensive ones in building construction. The scope of the study is confined to concreting only, because this activity can offer a potential for substantial substitution. The concept of work study and time lapse movie film is used to get the productivity of available resources for different work elements. A project of Bank of Thailand, 'New Head Office Building', at present under construction is used to assess the possibility of labour-in tensive substitution. Results of this study have indicated that totally labour-intensive method of construction is competitive coastwise and employment creation but results in an increased duration of the project.
Year1978
TypeThesis
SchoolStudent Research Before 1979
DepartmentOther Field of Studies (No Department)
Academic Program/FoSThesis (Year <=1979)
Chairperson(s)Scott, David
Examination Committee(s)Jearkjirm, Vithool ; Pama, Ricardo P.
DegreeThesis (M.Eng.) - Asian Institute of Technology, 1978


Usage Metrics
View Detail0
Read PDF0
Download PDF0