Browse by Title


Practical irrigation scheduling in Punjab of Pakistan
by Ahmad, Shahid
call number: AIT Thesis no.AE-80-04
Practices and behavior of deep excavations in thick soft clay of Ho Chi Minh City, Vietnam
by Nguyen Kiet Hung
call number:
Practices of contractor schedule/cost planning and control : a case study of resettlement high rise building project in Hochiminh City
by Bui Van Cuong
call number: AIT Proj. no.CM-09-20
Practices of labor export in Vietnam
by Nguyen Thi Minh Phuong
call number: AIT RSPR no.SM-07-88
Practices of owner project management team in life cycle of residential development projects of Nepal
by Panthi, Rashmi
call number: AIT Thesis no.CM-19-01
Prawn farming in the brackishwater areas of the Philippines : a study of the socio-economic characteristics of the prawn operators and coastal households in Camarines Sur
by Rodriguez, Melinda Ricafort
call number: AIT Thesis no. HS-88-28
Pre-consolidation with vertical drains influence of the permeability of the drain laboratory test and finite difference analysis
by Handali, Samuel
call number: AIT Thesis no. GT-81-06
Pre-construction delay in building project development : a case study of Investco Babylon Projecy in Ho Chi Minh City
by Nguyen Tran Tuong Ly
call number: AIT Proj. no.MPM-CM-11-21
Pre-design determination of project duration and cost
by Sadashiv, Modak Chandrashekhar
call number: AIT Thesis no. ST-79-20
Pre-feasibility of selected chemical products in Thailand
by Dalawampu, Miguel M.
call number: AIT Thesis no. IE-81-19
Pre-feasibility study for ecotourism in Koh Mak, Trat province, Thailand
by Sankamon Ubonpong
call number: AIT RSPR no.SM-00-18
Pre-Feasibility study for thu thiem project in Ho Chi Minh City, Vietnam
by Nguyen Dac Trung
call number:
Pre-project planning in practice : a case study of PetroVietnam
by Nguyen Thi Minh Hoa
call number: AIT Thesis no.ST-03-61
Pre-tensioned ferrocement : behaviour in direct tension an
by Hoang Vinh Thang
call number: AIT Thesis no. ST-85-11
Pre-treatment of domestic solid waste by enhanced leaching
by Dayanthi, W. K. C. N.
call number: AIT Thesis no. EV-03-26
Precast concrete application and logistics management of precast concrete construction in Vietnam
by To Thanh Huyen
call number: AIT Thesis no.CM-12-08
Precipitation of heavy metals from coal ash leachate using biogenic hydrogen sulfide
by Jayaranjan, Madawala Liyanage Duminda
call number: AIT Diss. no.EV-12-05
Precision agricultural
by
call number: Exam. ED70.12
Precision positioning using a microactuator for hard disk drive
by Yossawee Weerakamhaeng
call number: AIT Thesis no.ISE-99-42
Precooling effects on the quality of selected vegetables during storage
by Malee Kitvekin
call number: AIT Thesis no.AE-85-23