Robot selection for machine loading/unloading operations in a foundry : a case study by Thamrong Thamrongwang call number: AIT Thesis no.IE-94-24 |
Robot-aided rehabilitation and tele-rehabilitation systems design with sensorless torque control by Harischandra, Patikiri Arachchige Diluka call number: |
Robotic deburring system using machine vision by Chang, Huei-hong call number: AIT Thesis no.ISE-03-07 |
Robotic spray coating using stereo vision by Huynh Ngu Tuan Kiet call number: AIT Thesis no.ISE-07-15 |
Robust combined-objective particle swarm optimization for planning transition to plug-in hybrid electric vehicles by Sutisil Khedkaw call number: AIT Thesis no.ET-12-09 |
Robust control of a pneumatic system by Chutchpimuck Somboon call number: AIT Thesis no.ISE-21-12 |
Robust inspection and ROI adaptation algorithm for NDT swage torque test process by Nara Srieiang call number: AIT Thesis no.ISE-10-49 |
Robust joint transmitter and receiver power allocation for multi-user communications by Chirawat Kotchasarn call number: AIT Diss. no.TC-08-01 |
Robust open GL based 5-axis tool path verification algorithms by Kiasrithanakorn, Ben call number: AIT Thesis no.ISE-00-39 |
Robust quality function deployment for supporting technology roadmapping by Nguyen Thi Ngoc Truc call number: AIT Thesis no.ISE-08-08 |
Rock engineering for stability evaluation of South Block Area at Trubaindo Coal Mining Company by Pricha Sonkaeo call number: AIT Thesis no.GE-13-01 |
Rock engineering in stability evaluation of the Hongsa Coal Mine by Shrestha, Basanta Kumar call number: AIT Thesis no. GE-97-19 |
Rock engineering in the construction of structures in Nam Man and Nam San minihydropower projects in Loei Province, Northeastern Thailand by Kyaw Myat Khaing call number: AIT Thesis no. GE-00-04 |
Rock engineering related to the stability of the Tha Dan Dam by Ghimire, Hem Nath call number: AIT Thesis no. GE-97-20 |
Rock mass classification for some engineering purposes along the diversion tunnel at Chiew Larn Damsite, Surat Thani by Attayuth Ratanasatayanont call number: AIT Thesis no. GT-83-07 |
Rock mechanics by call number: Exam. CE71.12 |
Rock mechanics at the Lam Ta Khong Pumped Storage Project by Uba Sirikaew call number: AIT Thesis no. GT-93-25 |
Rock responses from the field observation and instrumentation of tunnels in Taiwan, and their correlation with rock mass properties by Lin, Yu-feng call number: AIT RSPR no. GT-88-01 |
Rock slope design at Mae Moh lignite mine by Somchai Aursirisuk call number: AIT Thesis no.GT-84-33 |
Rock slope engineering along Navigation Lock of Xayaburi Hydroelectric Power Project, Lao PDR by Wariyanan Hanka call number: AIT Thesis no.GE-16-02 |