Browse by Call Number


AIT Thesis no.ISE-03-44
Control of a moving base invert pendulum system
by Nguyen Thien Nam
AIT Thesis no.ISE-04-01
Concept development, design and analysis of agricultural mechanization : soybean planter
by Azrifirwan
AIT Thesis no.ISE-04-02
An empirical study of available to promise systems
by Pakorn Neungrit
AIT Thesis no.ISE-04-03
Mitigation management of hydropower dams development : the case of Lao PDR
by Sith Siripraphanh
AIT Thesis no.ISE-04-04
Development of a force-controlled surface profiler
by Surat Punyakaew
AIT Thesis no.ISE-04-05
Finite element analysis of open and closed shell core design for injection moldings
by Bovornpong Supaporn
AIT Thesis no.ISE-05-01
An preliminary investigation on abrasive waterjet milling (AWM) process
by Kumar, Amit
AIT Thesis no.ISE-05-02
An expert system for boiler fans maintenance support using vibration analysis technique
by Nguyen Hong Long
AIT Thesis no.ISE-05-03
Application of MiniSCADA in Hanoi electrical network
by Phung Quang Khai
AIT Thesis no.ISE-05-04
Development and implementation of a braking algorithm for a car crash avoidance system
by Jakra Tandhavatana
AIT Thesis no.ISE-05-05
Application of genetic algorithm in continuous flow shop scheduling
by Bui Thanh Trung
AIT Thesis no.ISE-05-06
A simulation model for wire harness assembly of automobiles
by Cenabre, Jocel R.
AIT Thesis no.ISE-05-07
Job scheduling with sequence-dependent setup time : a case study of Terdsak Engineering 1991 Limited Partnership
by Chatchai Chaloemphanit
AIT Thesis no.ISE-05-08
A simulation tool for performance evaluation of hybrid CONWIP/Kanban control policy
by Chu Thanh Chung
AIT Thesis no.ISE-05-09
Efficient warehousing : a case study of a toy manufacturing company in Thailand
by Dwivedi, Gajendra
AIT Thesis no.ISE-05-10
A GA-Benders algorithm for lot sizing and scheduling in a multistage production system with sequence dependent setup
by Terasak Jitngarmkusol
AIT Thesis no.ISE-05-11
Simulation-based tool for theory of constraints (TOC) implementation
by Chompoonoot Kasemset
AIT Thesis no.ISE-05-12
Decision support system for integrated planning and scheduling
by Kanokporn Kungwalsong
AIT Thesis no.ISE-05-13
A periodic review inventory model with joint orders for a retail gas station
by Le Nhu Hung
AIT Thesis no.ISE-05-14
Production planning : a case study of Thanglong-Viglacera Ceramic Tiles Company
by Le Sy Trung