Browse by Title


Establishment of PTSC Phu My Port Strategy, 2014-2020 period
by Nguyen Van Hoai
call number:
Estimated sulfur budget in an urban area: a case study of Bangkok, Thailand
by Rattanavijit Kosumsuriya
call number: AIT Thesis no.EV-05-21
Estimates of the availability of solar radiation in Myanmar from weather satellite images
by Thet, Naing
call number: AIT Thesis no. ET-93-24
Estimating benefits of watershed management projects in Chachoengsao (Thailand) using GIS
by Enclona, Eden A.
call number: AIT Thesis no.AE-92-53
Estimating daily evapotranspiration at field scales using metric and temporal fusion algorithms in Thailand
by Jaraspong Ruangekavit
call number: AIT Thesis no.WM-24-01
Estimating greenhouse gas emission in the corporate sector : the case of AIT, Thailand
by Panipak Thipthiangthae
call number: AIT RSPR no.ET-14-01
Estimating losses and downtime in high-rise buildings in Bangkok due to long distance earthquakes using a component-based methodology
by Kanokwan Artudorn
call number: AIT Thesis no.ST-16-08
Estimating Nonpoint source pollutant load impact on water quality of Inle Lake, Myanmar using N-SPECT model
by Kyawt Kyawt Khaing
call number: AIT Thesis no.WM-12-18
Estimating of the value of time of containerized cargo in Thailand
by Aunchulee Thongsongkrit
call number: AIT Thesis no.TE-04-01
Estimating permeability of a curing concrete based on resistivity and chargeability measurements
by Nagasingha, Lahiru Matheesha
call number: AIT Caps. Proj. no.CIE-17-44
Estimating present and future carbon stock from croplands in Dhaleshwari Watershed, Dhaka, Bangladesh
by Prianka, Kazi Sazia
call number:
Estimating short and long run time-of-use tariff elasticities for PEA's customer demand
by Prow Choompradit
call number: AIT Thesis no.ET-12-21
Estimating soil moisture using optical/thermal infrared remote sensing : a case study
by Vu Hai Son
call number: AIT Thesis no.WM-17-21
Estimating the comparative advantage of industries in Thailand : a domestic resource cost approach
by Salinee Watanapat
call number: AIT Thesis no.IE-93-43
Estimating the cost of design
by Terdkiat Mengveha
call number: AIT Thesis no.ST-97-26
Estimating the growth-interest rate trade-off threshold point : a case of Bangladesh
by Mohammad, Ear
call number:
Estimating the low-income housing stock in Bangkok
by Wang, Shieh-yu
call number: AIT Thesis no. HS-79-01
Estimating the thermal energy saving potential in industry : the case of Ho Chi Minh city
by Le Hoang Viet
call number: AIT Thesis no. ET-95-12
Estimating value of travel time reliability of transport users traveling between Nonthaburi area and downtown Bangkok
by Apichat Khamkongkhun
call number: AIT Thesis no.TE-02-01
Estimating variation in pedestrian safety due to mobile phone usage during crossings in on-campus and off-campus in Thailand
by Suhail, Shaik
call number: AIT RSPR no.TE-17-05