Establishment of PTSC Phu My Port Strategy, 2014-2020 period by Nguyen Van Hoai call number: |
Estimated sulfur budget in an urban area: a case study of Bangkok, Thailand by Rattanavijit Kosumsuriya call number: AIT Thesis no.EV-05-21 |
Estimates of the availability of solar radiation in Myanmar from weather satellite images by Thet, Naing call number: AIT Thesis no. ET-93-24 |
Estimating benefits of watershed management projects in Chachoengsao (Thailand) using GIS by Enclona, Eden A. call number: AIT Thesis no.AE-92-53 |
Estimating daily evapotranspiration at field scales using metric and temporal fusion algorithms in Thailand by Jaraspong Ruangekavit call number: AIT Thesis no.WM-24-01 |
Estimating greenhouse gas emission in the corporate sector : the case of AIT, Thailand by Panipak Thipthiangthae call number: AIT RSPR no.ET-14-01 |
Estimating losses and downtime in high-rise buildings in Bangkok due to long distance earthquakes using a component-based methodology by Kanokwan Artudorn call number: AIT Thesis no.ST-16-08 |
Estimating Nonpoint source pollutant load impact on water quality of Inle Lake, Myanmar using N-SPECT model by Kyawt Kyawt Khaing call number: AIT Thesis no.WM-12-18 |
Estimating of the value of time of containerized cargo in Thailand by Aunchulee Thongsongkrit call number: AIT Thesis no.TE-04-01 |
Estimating permeability of a curing concrete based on resistivity and chargeability measurements by Nagasingha, Lahiru Matheesha call number: AIT Caps. Proj. no.CIE-17-44 |
Estimating present and future carbon stock from croplands in Dhaleshwari Watershed, Dhaka, Bangladesh by Prianka, Kazi Sazia call number: |
Estimating short and long run time-of-use tariff elasticities for PEA's customer demand by Prow Choompradit call number: AIT Thesis no.ET-12-21 |
Estimating soil moisture using optical/thermal infrared remote sensing : a case study by Vu Hai Son call number: AIT Thesis no.WM-17-21 |
Estimating the comparative advantage of industries in Thailand : a domestic resource cost approach by Salinee Watanapat call number: AIT Thesis no.IE-93-43 |
Estimating the cost of design by Terdkiat Mengveha call number: AIT Thesis no.ST-97-26 |
Estimating the growth-interest rate trade-off threshold point : a case of Bangladesh by Mohammad, Ear call number: |
Estimating the low-income housing stock in Bangkok by Wang, Shieh-yu call number: AIT Thesis no. HS-79-01 |
Estimating the thermal energy saving potential in industry : the case of Ho Chi Minh city by Le Hoang Viet call number: AIT Thesis no. ET-95-12 |
Estimating value of travel time reliability of transport users traveling between Nonthaburi area and downtown Bangkok by Apichat Khamkongkhun call number: AIT Thesis no.TE-02-01 |
Estimating variation in pedestrian safety due to mobile phone usage during crossings in on-campus and off-campus in Thailand by Suhail, Shaik call number: AIT RSPR no.TE-17-05 |