AIT Thesis no.IE-94-09 Input-output models for production-pollution analysis : the case of a textile factory by Oo Oo Khin
|
AIT Thesis no.IE-94-10 Manufacturing resource planning (MRP-II) : a case study by Quashem, Md. Abul
|
AIT Thesis no.IE-94-11 Building blocks for the simulation of a modular production system by Pak Wongvipas
|
AIT Thesis no.IE-94-12 Simulation study of a gear case cover production line by Charun Pachiyanukoon
|
AIT Thesis no.IE-94-17 Machine-part family formation in cellular manufacturing systems : a multicriterion approach by Kulasinghe, A. S. S.
|
AIT Thesis no.IE-94-18 Optimum preventive maintenance policies : a case study of the boiler at North Bangkok Unit II by Thumnoon Funaranarth
|
AIT Thesis no.IE-94-19 Classification of selected stocks in Thailand -- using cluster analysis by Marrut Manistitya
|
AIT Thesis no.IE-94-20 Benchmarking selected machine tool manufacturing firms in China by Yang, Hong
|
AIT Thesis no.IE-94-21 Grouping of industries for investment promotion using cluster analysis by Sara Suthasut
|
AIT Thesis no.IE-94-22 The impact of foreign direct investment on export performance and employment generation in the Indonesian manufacturing sector by Sudaryanto
|
AIT Thesis no.IE-94-23 Throughput maximization in production lines with high influence of learning by Sripeni Puspasari Sugiyanto
|
AIT Thesis no.IE-94-24 Robot selection for machine loading/unloading operations in a foundry : a case study by Thamrong Thamrongwang
|
AIT Thesis no.IE-94-25 An analysis of trade flows between China and selected Asian countries by Zheng, Botao
|
AIT Thesis no.IE-94-26 A PC-based heuristic infinite capacity job shop scheduler by Nay Win
|
AIT Thesis no.IE-94-27 International trade and technology transfer : case study of China with the West by Ji, Jing
|
AIT Thesis no.IE-94-28 A comparative study of algorithms for level scheduling in just-in-time production systems by Medhi, Santanoo
|
AIT Thesis no.IE-94-29 Multiattribute decision model for prioritizing small-scale industrial activities by Amin, Abdusy Syakur
|
AIT Thesis no.IE-94-30 Multi-resource leveling in a multi-project environment by Shi, Jiangfeng
|
AIT Thesis no.IE-94-31 Simulation approach to the performance evaluation of an industrial port system by Oey, Elia
|
AIT Thesis no.IE-94-32 Production planning in a job shop system with bottleneck machines : a case study by Zhao, Xia
|